
"We have a problem."
"Oh, I'll leave," I said turning around and walking back down the stairs. The last thing you want to hear from your contractor is anything about a problem.
Turns out the cement patch was actually covering the area where the toilet used to be. Very strange. The floor wasn't level which means the sub floor needed to be torn up. Oh, and the tub had some damage and if we wanted to replace it we should do it now.
"So, what does this mean?" I asked.
"You need a new tub and materials for sub floor," he said.
Ok, I can handle that. I always wanted a jetted tub anyway, but add another $600 to the budget. I wonder what tomorrow will bring. That Power Ball victory would have really come in handy last night.
What can I say? We bought a fixer upper. It better look real nice when we're done with it!
No comments:
Post a Comment